Week Commencing 26th April 2021
At the end of the day most of the wood work had been sorted out a nd in position. lets see what happens on Wednesday.
Wednesday
The Spear Fence erecting crew were seen moving the panels for the slope into position .
Afterwards it was back up to platform 2 continue the spear fencing.
Two more panels of Spear Fence added.
Back outside the work shop the Hayles board had its first coat of undercoat and its top fitted .
Locomotive of today was " Foremarke Hall " seen here pulling the first train of the day into Broadway.
Dave and Vic , and some pictures from Rod.
This sounds like a Bond Film. No! tomorrow trains are back.
They will be the same as last Autumn Covid restricted, passengers staying in their compartment whilst travelling. Going from Toddington to Cheltenham return to Broadway and back to Toddington. Changes have been made at Toddington with a new entrance road keeping cars and pedestrians separate and hopefully safer.
Waking up at home it is white outside.
The roads were clear and all Monday volunteers were at work.
At the workshop Ian sorting out hosepipes, Brian is talking to Dave who is repairing the Hayles Abbey Halt board.
Tony and Brian have uncovered the memorial bench and cut the grass. Jo just arrived.
David also taking photos. Is it me?
Here is 2 shots of the Spear Fencing on Platform 2 showing the progress.
The edging slabs can be seen quite well on the down slope to the crossing. A similar finish will be done on the Platform 1 side to match.
The Strimmer brigade of Pat and Peter were attacking the grass behind the Driveway fence.
It looks as if Mrs Mop was at the Station today. The equipment is standing idle but where is she?
I was starting the clearance of the flower beds. Where does all these weeds come from?