Friday 8 March 2024

Still a nip in the Air

 Week commencing 4th March 2024


Monday

A bright and frosty start to the day for the usual few that turns out , first a look at Platform 2 ,with all the Stanchions up and block work on going.


Brian un deterred carried on with the treatment of the fence. 


After the running board had another coat of black , Ian and Dave sorted out a wobbly kiosk with a few wedges inserted !


The bin had its lid finally put back on it after refurbishment.


Wednesday


Platform 2 shows that the platform edge has had most of the blocks put over to the field side to start the back wall


Fence all treated looking good for another couple of years.


A  pair of volunteers watched the proceedings on platform 2 before moving onto painting the spear fencing.


Brian had a little job fitting the cash drawers in the Booking office.


Dave and Ian after painting the letters white on the running board , headed into the container to do the same with the surroundings.


Dave



No comments:

Post a Comment