Week Commencing 17th August 2026
Monday
The day of the roof structure being delivered and its erection.
First thing before it happened .
From down by our workshop , Do think his Jib was long enough ?
And the result , a perfect fit .Well done to Neil and his team .
We did manage to do some work in between the watching of the proceedings
The weather has had an effect on the Kitchen door , making it stick on the concrete in places , door had to be taken off and the bottom rubbed down .
Outside the drain had blocked up again with pine needles , after just one shower !
Chris battled with the weeds in the memorial garden .
Wednesday
A few more in today , mostly working on gardening stuff .
Kevin had help with the watering , which takes a few hours nowadays .
Outside in the real world , the 2 Class 37`s were doing their Turns,
Dave
.
No comments:
Post a Comment