Thursday 1 February 2024

Pottering on.

 Week Commencing 29th January 2024


January almost over and the odd jobs list is getting smaller . 

6 volunteers around on Monday , as usual a look at what Neal and his gang had been doing on platform 2 , looks like all the trenches for the footings have been complete  and an access bridge had been erected over the tracks. 


A quick look at the hole on the cutting revealed more activity had occurred since last week .


Brian was back at the sheds , firstly completing the bottom of the ( other shed ) and then a bit of touching up on the goods shed .


And then back on the sales shed he painted the galvanized conduit black 


A dry day saw Peter K with " Billy " doing a few laps of the drive.


Brian was back in the Station Masters office , putting a back on the Ticket holder.


We have a new sign for the goods shed ! Dave constructed 2 runners so it could be removed easily at the end of the day.


Mike was rubbing down the tops of the spear fencing.


Wednesday


Bottom of the drive by the post box was a bit of a mess , Brian , Ian and young Dave were on the job.


Dave was getting to the end of bin construction , all lids had been fitted by lunchtime , painting them  started in the afternoon.


Pat was down the track having the yearly battle with the young Ash trees.


Chris was having a go at clearing out one of the drains.




The lads at the bottom of the drive completed their task and left it looking a lot tidier !

5 comments:

  1. has the camara gone down on platform2 as theres no picture

    ReplyDelete
  2. Hope the camera will be working for the concrete pour

    ReplyDelete
  3. Why is the camera down?

    ReplyDelete
  4. Great blog, which keeps us up to date with all things Broadway. Looks as though everyone's gone a bit camera shy as it's down at the moment and has been a couple of days. Any problems?

    ReplyDelete
  5. Camera temporary shut down whilst Concrete being poured for reasons best not said on line !

    ReplyDelete