Thursday 9 March 2023

Next Project

 Week Commencing 6th March 2023


Another cold  day in March ! 

Dave, Brian ( our new head honcho ),Ian , Vic , Chris and Pat all turned up.

Time for a tidy up around the station auxiliary buildings . First lets see what paint we have !




Just a small tub of dark brown wood preserver was found , just enough for Brian and Ian to do the edges of the Sales hut.


Then it was on to bigger things , all the containers on platform 2 are looking a bit grim.. we found some old grey paint and a tin of brownish paint, But first they needed rubbing down,


Ian and Brian looking at the task in hand ,


Pat took this rare photo of Me using mechanical assistance rubbing down the office , better than a scrapper I thought !


Elsewhere Chris was on the barrier having found a can of  brown fence life. Viv and Pat were doing stuff with the vegetation.


End of the day saw the Office fully rubbed down with the bare patches now covered in red oxide paint , but we could do nothing about the holes , they will have to stay !

Wednesday

Another miserable day , only myself and Ian turned out.

Too wet to do most things , but we put the resharpened blades on the Chop and Table saws, sorted out some more unused kit out of container 1 and donated it to the Construction and Maintainace guys doing the tarmacking on platform 1 .

And then as it started to rain yet again we decided to go home.

Dave



2 comments:

  1. Hopefully those containers won't be there too much longer with the commencement of platform 2 building?

    ReplyDelete
    Replies
    1. Add the horrible garden sheds to that list of things to get rid of!

      Delete